Insights

Case Studies

Explore practical implementation stories, project outcomes, and real-world use cases.

Case Study Snapshot

Allied Energy II | Multiphase Vapor Recovery

100% uptime over 15+ months 0 maintenance Operated below -40°C Gas venting eliminated
“...eliminated gas venting… 100% uptime and no maintenance since installation.”
Lower maintenance Continuous operation Reduced emissions
Read More
Case Study Snapshot

4.5+ years of reliable vapor recovery

A southern Alberta producer used Fluidstream’s VaporCommander™ to capture tank vapors, reduce emissions, and avoid the maintenance burden commonly associated with conventional VRU systems.

35
months before first seal change
1
seal change over reported operating life

“To date, with the exception of the seal change after 35 months, the unit has not had any failures or service issues in more than 4.5 years of operation.”

Fluidstream Case Study
Website-ready HTML box for homepage, landing page, or insights section.
Read More
Case Study Snapshot

From virtually no production to more than C$1.5 million/year in incremental revenue

In Alberta, Canada, Fluidstream’s MultiphaseCommander™ helped revive two liquid-loaded wells that could no longer overcome rising pipeline pressure. The result was restored production, no added separation equipment, and dependable operation under highly variable multiphase conditions.

Gas Production
10e3 m³/d
Combined gas production restored across both wells after installation.
Condensate
5 m³/d
Daily condensate production recovered without added separation infrastructure.
Revenue Impact
C$1.5M+
Estimated annual incremental revenue based on April 2026 commodity pricing.

“Fluidstream’s MultiphaseCommander didn’t just improve performance—it completely transformed two dead wells into revenue-generating assets. We went from zero production to over $1.5 million per year in incremental revenue, without adding any separation equipment or infrastructure.”

Production Engineer, Western Canadian Oil & Gas Producer
Read the full case study for the operating challenge, deployment details, runtime importance, variable-flow performance, and the broader pad-level opportunity identified by the producer.
Read More